Equipment / Bitumen Park

Complete, Connected, and Ready to Perform

This turnkey solution includes all required equipment, fully integrated from the new binder storage area to your mixing tower. It features vertical tanks, heating systems, a unloading station, and full automation.

Vertical Bitumen Tanks (2 x 100,000 L):

  • Electric heating: variable power based on tank capacity, PID-controlled
  • Vertical agitators with three blades on each tank
  • Sandblasting treatment and interior/exterior painting
  • Secure access via galvanized stairways and upper walkways
  • Temperature control: sensors, digital displays, thermocouples
  • Level measurement: non-contact radar, electronic low- and high-level sensors
  • Reinforced insulation: rock wool + fiberglass, 8" walls + 12" upper and lower sections
  • Connections for filling, return lines, sensors, and overflow

Heated Piping Network:

  • Self-regulating heat tracing
  • Temperature sensors by zone
  • Designed for future expansion
  • Insulation up to 4" with rock wool and aluminum cladding

Bitumen Dosing System:

  • Pumps for batch and continuous operations
  • Electric cartridge heater (1 kW) with sensor
  • Three-way motorized valves for filling and injection
  • Coriolis-type flow meter

Automation and Control:

  • Independent electrical control panel with supervision
  • Remote access via VPN
  • 7-day heating schedule, by zone
  • Energy monitoring by equipment and time period
  • Emergency stop, alarms, and status indicators

Unloading Station:

  • Manual and motorized valves (3" and 4") with pneumatic control and positioner
  • Self-cleaning filter, scraping and draining system, sampling valve, disconnect safety
  • Electrically heated pump, with optional integrated dual relief valve for bidirectional rotation
  • Transparent protective enclosure, NEMA-rated sealed cabinet

YEARS OF EXPERTISE

68

SATISFIED CLIENTS

800

COMPLETED PROJECTS

2003

CITIES

150